Prime Minister Narendra Modi launched the Poonamallee-Vadapalani stretch of the Chennai Metro Rail Project on Sunday, a major endeavor costing about Rs 4,900 crore with an innovative 3.7-km double-decker design. Daily services will kick off from October 12, operating from 7 am to 9 pm with a start time at 4 pm.: इस घटनाक्रम पर आधिकारिक अपडेट दर्ज किया गया है। There are a total of 11 elevated Metro Stations covering approximately 15 km in the newly inaugurated stretch
फैसले की बड़ी बातें: क्या लिए गए अहम निर्णय
Prime Minister Narendra Modi launched the Poonamallee-Vadapalani stretch of the Chennai Metro Rail Project on Sunday, a major endeavor costing about Rs 4,900 crore with an innovative 3.7-km double-decker design. Daily services will kick off from October 12, operating from 7 am to 9 pm with a start time at 4 pm.
There are a total of 11 elevated Metro Stations covering approximately 15 km in the newly inaugurated stretch
नियम, शर्तें और संबंधित वर्ग पर सीधा असर
- •Prime Minister Narendra Modi launched the Poonamallee-Vadapalani stretch of the Chennai Metro Rail Project on Sunday, a major endeavor costing about Rs 4,900 crore with an innovative 3.7-km double-decker design. Daily services will kick off from October 12, operating from 7 am to 9 pm with a start time at 4 pm.
- •There are a total of 11 elevated Metro Stations covering approximately 15 km in the newly inaugurated stretch
ताजा स्थिति व आगे का अपडेट
इस घटनाक्रम पर संबंधित अधिकारियों और प्रशासनिक स्तर पर निरंतर समीक्षा जारी है। ताजा आधिकारिक सूचना के आधार पर विवरण को अद्यतन किया जाएगा।









